How to Prepare Your Kitchen for New Countertops

The crew is supposed to arrive and measure. Often the cabinets are still out of level and the sink is not even ordered. Most of the delay on a countertop job in Greenville, SC comes from that gap, and the checklist sitting on countertops greenville backyard barter lists the prep in the order it gets tripped over. What follows is the same sequence, written the way it plays out on site.
Cabinets first, and level

Base and wall cabinets must be fully installed, secured, and level before templating. The template records their exact final position, so any cabinet that shifts afterward throws the slab off. New tops do not go on until the boxes are shimmed and screwed down. A slab cut to a crooked run will rock, and a seam that was tight on the template will open.
Fixtures on hand

Choose the sink, faucet, and cooktop before the template visit and have them in the house. Each cutout is sized to the fixture's own template or dimensions, and an undermount bowl sets the reveal and the edge profile around it. A different sink swapped in after the stone is cut may not fit the opening. Granite, quartz, or porcelain, the rule is the same.
Clear the surfaces and the sink base
Empty everything from the countertops and from the cabinet under the sink. Installers lie on their backs in there to set clips and check the plumbing, and they need the room. Small appliances, the dish rack, and cleaning supplies all go elsewhere. Clear overhang areas too, since the tape and the template stick run along those edges.
Disconnects and demolition
Plumbing to the sink and dishwasher is usually disconnected before old tops come off. Gas or electric cooktops are disconnected by a qualified person, not by whoever has a wrench. Pulling old stone or tile creates dust and debris, so cover nearby floors and close off doorways with plastic. Do not assume the backsplash survives removal. Tile set on the old top often comes with it, and laminate or butcher block tops may take paint along.
Path, dust, and the work area
Stone slabs are carried on edge rather than flat, which lowers the chance of cracking, so the route from the door to the kitchen needs to be clear and straight. Move furniture, take down hanging art, and prop the doors. A long run with a seam near the sink is carried in pieces, and every turn in a hallway is a risk. Any small on site cutting or polishing makes fine dust, especially on quartz, quartzite, or marble. Keep pets and children out of the work area until the sweep is done.